Standard label: | Inventory, Work in Process, Net of Reserves |
Name: | us-gaap:InventoryWorkInProcessNetOfReserves |
Documentation: | Carrying amount, net of reserves and adjustments, as of the balance sheet date of merchandise or goods which are partially completed. This inventory is generally comprised of raw materials, labor and factory overhead costs, which require further materials, labor and overhead to be converted into finished goods, and which generally require the use of estimates to determine percentage complete and pricing. |
Object type: | cm:Concept |
Data type: | Monetary (xbrli:monetaryItemType) |
Period type: | As Of (instant) |
Balance type: | Debit |
Abstract: | false |
Workiva Wdesk Taxonomy Analyzer: | us-gaap:InventoryWorkInProcessNetOfReserves |
Label | Role | Language |
Inventory, Work in Process, Net of Reserves | http://www.xbrl.org/2003/role/label | en-US |
Reference | Role | Topic |
FASB Accounting Standards Codification 210 10 S99 1 (SX 210.5-02(6)(a)(3)) | http://fasb.org/us-gaap/role/ref/legacyRef | 210 |
FASB Accounting Standards Codification 330 10 S99 2 (SAB Topic 5.BB) | http://fasb.org/us-gaap/role/ref/legacyRef | 330 |
Part Of Roll Up: |
us-gaap:InventoryWorkInProcessAndRawMaterialsNetOfReserves |